Reports and Studies

The list of reports and studies contained in this section relate to construction projects being planned and other aspects of Turnpike operations. The Turnpike’s 2007 Annual Report of Operation & Maintenance (3.6MB PDF) encompasses a review of all the facilities on the Turnpike from the condition of the highway itself to the condition of our buildings, bridges, service plazas, maintenance areas and toll plazas. This document helps to identify potential deficiencies requiring more immediate attention, but also provides insight on which projects can be placed on a construction schedule as part of the Turnpike’s 10-Year Plan (.8MB PDF) of project priorities and goals.

Park & Ride Reports
Maine’s Park & Ride Lots: System Update 2007 (.5MB PDF)
Maine’s Park & Ride Lots: Evaluating and Strengthening the System (2.2MB PDF)

Maine Turnpike Authority Annual Reports

2006 MTA Annual Report

2006 Annual Report (1.6MB PDF)
2005 Annual Report (.7MB PDF)
2004 Annual Report (2.9MB PDF)
2003 Annual Report (.8MB PDF)
2002 Annual Report (3.9MB PDF)
2001 Annual Report (1.4MB PDF)
2000 Annual Report (5.4MB PDF)

Storm Water Management Plan (SWMP) – Annual Summary Reports
Permit Year 4 - Storm Water MS-4 (9.8MB PDF)
Permit Year 3 - Storm Water MS-4 (7.7MB PDF)
Permit Year 2 - Storm Water MS-4 (47.8MB PDF)
Permit Year 1 - Storm Water MS-4 (.2MB PDF)

Storm Water Implementation Progress - Annual Reports
2007 MOA Report (12MB PDF)
2006 MOA Report (8.4MB PDF)
2004 MOA Report (1.2MB PDF)
2003 MOA Report (1.3MB PDF)